New restaurant kitchen equipment 220V upright fridge freezer 201 Stainless steel 3 door upright deep freezer
1) gastronorm standard size, suitable for GN PANS
2) hight quality stainless steel 201 / 304
3) CE, ROHS approved
4) CFC free refrigerant and foam
5) imported brand compressor
6) ventilated, automatic defrosting and evaporation of condensation water
7) digital temperature controller
8) adjustable shelves and shelfbracket
9) self-closing door fitted with easy to clean, replaceable magnetic balloon gaskets
10) heavy duty adjustable S/S legs or easy movable castors/wheels
11) optional for stainless steel door or glass door
Item Name: |
DG1.6L6 |
Size (L*D*H): |
1810*700*1950mm |
Weight: |
205 kg |
Capacity: |
1280L |
Cabinet temperature: |
0~10°C or -5 ~ -18°C |
Cooling type: |
Static or fan cooling |
Refrigerant: |
R134a/R404 |
Compressor: |
DANFOSS/EMBRACO |
Power: |
380/620W |
Voltage: |
220v/50Hz/ 220V/60Hz/ 110V/60Hz |
Package: |
Wooden frame with carton box ( With standard export package ) |
Freezer
1) Imported compressor;
2) Competitive price;
3) Efficiency and energy saving;
4) Adjustable and easy to install and operate;
5) Products are with CE, and CCC certificate;
6) Popular in restaurant, KTV, hotel, and bar and so on.
Feature
1.hight quality stainless steel 201 / 304
2.digital temperature controller
3.adjustable shelves and shelfbracket.
4.optional for stainless steel door or glass door.
5.self-closing door fitted with easy to clean, replaceable magnetic balloon gaskets.
Packing & Delivery
FAQ:
1.Q: What is the MOQ of an order?
A: We accepts 1 unit as trial order
2.Q: What are your payment methods?
A: T/T,30% in advance,70% balance before delivery .
3.Q:How about customization?
A: ODM/OEM business partner will be warmly welcome. Please contact us for more details.
4.Q:How About The Delivery Time?
A: 1. Some of the products are in stock at our warehouse is European plug, generally we need 1~3 days
to change the plugs and package them before the delivery.
2. Regarding to the non-stock products, the lead time is 15- 30 days depends on your requirements
and quantity. requirements and quantity.
3. We will suggest you the fastest shipping methods when you need the products urgently.
5.Q: Where is your factory located? How can I visit there?
A: Our factory is located in bai yun district,Guangzhou, Guang Dong province. You can fly to Guangzhou
Airport South directly. we will pick you up .